Hydrogen Network Drenthe and Overijssel is the hydrogen network in the provinces of Drenthe and Overijssel. This part of the network provides the connection to the industrial cluster in the Northern Netherlands (Groningen) and to Hydrogen Network Eastern Netherlands. In the future, there will also be a connection from this area to Germany.
The project at a glance
Hydrogen Network Drenthe and Overijssel will connect hydrogen producers and customers in industrial areas. This involves the construction of a hydrogen pipeline between Stadskanaal and Ommen with branches to Vlieghuis near Coevorden and to the GZI Next energy hub near Emmen. A shut-off location will be built at Gasunie’s Vlieghuis export station (near Coevorden) to enable a connection from this location. This also will enable the future connection to industrial areas in Germany.
New and existing pipelines
Hydrogen Network Drenthe and Overijssel will consist largely of existing natural gas pipelines that will be converted for use by hydrogen. Where it is not possible to reuse existing pipelines, new pipelines will be built.
Existing natural gas pipelines can be reused and converted for use by hydrogen between Stadskanaal and Ommen and between Schoonebeek and Nieuw-Amsterdam.
A new pipeline about 23 kilometres long is planned between Elim and Vlieghuis, and a new pipeline about 5 kilometres long is planned between Vlieghuis and Schoonebeek (NAM’s combined heat and power plant). Another new pipeline of about 8 kilometres is planned between Nieuw-Amsterdam and Emmen (the GZI site). The proposed new pipelines will be laid in the pipeline strip and largely clustered with Gasunie’s existing natural gas pipelines.
Karin van der Ploeg
Regional manager Groningen and Drenthe Overijssel
Map with the route of the hydrogen pipeline
Stay informed with our newsletter
Useful links & downloads
- Newsletter #6 - Hydrogen network Drenthe Overijssel (July 2026)
- Newsletter #5 - Hydrogen network Drenthe Overijssel (October 2025)
- Newsletter #4 - Hydrogen network Drenthe Overijssel (March 2025)
- Newsletter #3 - Hydrogen network Drenthe Overijssel (September 2024)
- Newsletter #2 - Hydrogen network Drenthe Overijssel (January 2024)
- Newsletter #1 - Hydrogen network Drenthe Overijssel (November 2023)
- Overviews op maps - Hydrogen network Drenthe Overijssel (January 2024)
- Map Hydrogen Network Drenthe Overijssel (January 2024)
- Map tracé Coevorden - Emmen (January 2024)
- Map tracé Elim - Coevorden (January 2024)
- Map Hydrogen Network Aa and Hunze (July 2023)
- Map Hydrogen Network Borger-Odoorn (July 2023)
- Map Hydrogen Network Coevorden (July 2023)
- Map Hydrogen Network from Elim to Emmen, part 1 (July 2023)
- Map Hydrogen Network from Elim to Emmen, part 2 (July 2023)
- Map Hydrogen Network Emmen (July 2023)
- Map Hydrogen Network Hardenberg (July 2023)
- Map Hydrogen Network Hoogeveen (July 2023)
- Map Hydrogen Network Middle-Drenthe (July 2023)
- Map Hydrogen Network Ommen (July 2023)
-
Reacties werksessies Waterstofnetwerk Drenthe Overijssel (januari 2026)
-
Verslag werksessie Waterstofnetwerk Drenthe Overijssel (januari 2026)
-
Aandachtspunten werksessie Waterstofnetwerk Drenthe Overijssel (15 september 2023)
-
Reacties werksessie Waterstofnetwerk Drenthe Overijssel (15 september 2023)
-
Reacties werksessie Waterstofnetwerk Drenthe Overijssel (7 november 2024)
-
Aandachtspunten werksessie Waterstofnetwerk Drenthe Overijssel (7 november 2024)
Frequently asked questions
What will I experience as a result of hydrogen network construction?
Developing a hydrogen network project will have an impact on the surrounding area and the environment. In addition, there are already many other cables and pipelines in the crowded underground. We want to limit this impact. We will do so by using existing natural gas transport pipelines as much as possible. When new pipes are needed, we will join them to existing pipelines wherever possible. As with natural gas, the immediate vicinity of the pipeline (the route) will be kept free of buildings for safety reasons.
As well as the spatial impact, there also will be temporary disruptions during the construction and modification of pipelines and installations. Gasunie has extensive experience in building natural gas transport networks. The impact of a hydrogen network by Hynetwork will be similar. For example, there may be noise and vibrations, and space must be made available for work sites. As we get closer to construction, we will communicate promptly with neighbouring residents about the impact. You will not notice the transport of hydrogen through the pipes.
Can I connect my home to the hydrogen network?
No, we will not connect your home to the hydrogen network. Green hydrogen (produced with green electricity) is still in short supply, so it is important to make smart choices about where (green) hydrogen can be used and where it will have the greatest effect. For domestic use, such as heating, showering and cooking, there are already suitable sustainable alternatives, such as electric heating. For other sectors, such as heavy industry, green hydrogen is often the only way to become sustainable. Therefore, our limited supply of green hydrogen should be used mainly in those sectors where, even in the long term, there is no sustainable alternative.
Connecting homes and smaller businesses is the job of regional grid operators, such as Stedin or Enexis. They are exploring the possibility of a hydrogen network for homes and smaller businesses in the future.
Will there also be a low-pressure hydrogen pipeline in the regions?
As with the natural gas network, we make a distinction in the hydrogen network between a high-pressure network (being developed by Hynetwork) and a low-pressure network (being developed by distribution network operators such as Alliander). Hynetwork is only laying a high-pressure network. In the future, regional distribution networks can be linked to the national hydrogen network operated by Hynetwork. Currently, the legal framework of linking distribution networks to the national hydrogen network is not yet in place.
How can I participate in the plans?
Construction of the hydrogen network requires permits from various government bodies. To keep everything on track, the Ministry of Economic Affairs and Climate Policy (EZK) is coordinating the decision-making process. We call this the Project Procedure. EZK and Hynetwork Services believe it is important that everyone has the opportunity to contribute ideas. This is why we will organise walk-in meetings among other things, and there will be several opportunities to submit responses and comments.
Is Hynetwork responsible for the import and production of hydrogen?
Hynetwork is only concerned with the transport network for hydrogen and not about the production, import or use of hydrogen.