Groningen
Hydrogen Network Groningen is the part of the national hydrogen network that runs from Eemshaven via Tjuchem to Delfzijl, and then to the Dutch-German border at Oude Statenzijl and the provincial border with Drenthe at Nieuwediep. It provides an essential connection within the province of Groningen and with neighbouring regions.
The project at a glance
Hydrogen Network Groningen connects industry in Eemshaven with industry in Delfzijl. It also uses the storage facility in Zuidwending. Note: the hydrogen storage facility in Zuidwending and the pipeline to and from Zuidwending are not part of the Hydrogen Network Groningen project .
Regional industries in Groningen, such as those around Veendam and Midden-Groningen, will also be connected to Hydrogen Network Groningen. About 9 to 12 gigawatts (GW) of hydrogen is expected to be transported from Eemshaven, and about 2 GW of this will be delivered to industries in Delfzijl.
Karin van der Ploeg
Regional manager Groningen and Drenthe Overijssel
Map with the route of the hydrogen pipeline
Stay informed with our newsletter
Useful links & downloads
Newsletter #7 - Hydrogen network Groningen (May 2026)
Newsletter #6 - Hydrogen network Groningen (July 2025)
Newsletter #5 - Hydrogen network Groningen (February 2025)
Newsletter #4 - Hydrogen network Groningen (July 2024)
Newsletter #3 - Hydrogen network Groningen (April 2024)
Frequently asked questions
What will I experience as a result of hydrogen network construction?
Developing a hydrogen network project will have an impact on the surrounding area and the environment. In addition, there are already many other cables and pipelines in the crowded underground. We want to limit this impact. We will do so by using existing natural gas transport pipelines as much as possible. When new pipes are needed, we will join them to existing pipelines wherever possible. As with natural gas, the immediate vicinity of the pipeline (the route) will be kept free of buildings for safety reasons.
As well as the spatial impact, there also will be temporary disruptions during the construction and modification of pipelines and installations. Gasunie has extensive experience in building natural gas transport networks. The impact of a hydrogen network by Hynetwork will be similar. For example, there may be noise and vibrations, and space must be made available for work sites. As we get closer to construction, we will communicate promptly with neighbouring residents about the impact. You will not notice the transport of hydrogen through the pipes.
Can I connect my home to the hydrogen network?
No, we will not connect your home to the hydrogen network. Green hydrogen (produced with green electricity) is still in short supply, so it is important to make smart choices about where (green) hydrogen can be used and where it will have the greatest effect. For domestic use, such as heating, showering and cooking, there are already suitable sustainable alternatives, such as electric heating. For other sectors, such as heavy industry, green hydrogen is often the only way to become sustainable. Therefore, our limited supply of green hydrogen should be used mainly in those sectors where, even in the long term, there is no sustainable alternative.
Connecting homes and smaller businesses is the job of regional grid operators, such as Stedin or Enexis. They are exploring the possibility of a hydrogen network for homes and smaller businesses in the future.
Will there also be a low-pressure hydrogen pipeline in the regions?
As with the natural gas network, we make a distinction in the hydrogen network between a high-pressure network (being developed by Hynetwork) and a low-pressure network (being developed by distribution network operators such as Alliander). Hynetwork is only laying a high-pressure network. In the future, regional distribution networks can be linked to the national hydrogen network operated by Hynetwork. Currently, the legal framework of linking distribution networks to the national hydrogen network is not yet in place.
How can I participate in the plans?
Construction of the hydrogen network requires permits from various government bodies. To keep everything on track, the Ministry of Economic Affairs and Climate Policy (EZK) is coordinating the decision-making process. We call this the Project Procedure. EZK and Hynetwork Services believe it is important that everyone has the opportunity to contribute ideas. This is why we will organise walk-in meetings among other things, and there will be several opportunities to submit responses and comments.
Is Hynetwork responsible for the import and production of hydrogen?
Hynetwork is only concerned with the transport network for hydrogen and not about the production, import or use of hydrogen.