Southwest Netherlands
Industry in Zeeland accounts for 35% of current demand for hydrogen for the production of fertilisers, fuels and plastics in the Netherlands. Since this hydrogen is produced from natural gas, this region is responsible for a significant proportion of Dutch CO₂ emissions. The future hydrogen network in the southwest Netherlands will supply green hydrogen to industry in Zeeland and connect this region to other regions.
The project at a glance
Hydrogen Network Southwest Netherlands is the part of Hydrogen Network Netherlands that connects the industrial clusters in Zeeland (North Sea Port area) with Belgium and with industries in the ports of Bergen op Zoom and Moerdijk. The network runs from the Belgian border at Sas van Gent through Zeelandic Flanders and West Brabant to Moerdijk, with a branch to Borsele and the Sloegebied in Vlissingen. This creates a regional network for hydrogen importers and customers.
Having a reliable hydrogen network at the right time is crucial for the growth of the hydrogen economy, both nationally and regionally – particularly in the Scheldt Delta region of Zeeland and West Brabant. The Scheldt Delta region is home to many energy- and resource-intensive companies that face significant sustainability challenges. The region is already a major producer and user of hydrogen today, but the focus is still on the production and use of grey hydrogen. The construction of a hydrogen network will help create a sustainable business environment that will enable the region to maintain a strong position in terms of economic growth and employment.
Stephan Tiemessen
Regional manager Southwest Netherlands
Below you will find a regional map that shows the possible route of the hydrogen network in Southwest Netherlands. The map also allows you to share your questions, concerns, suggestions and feedback with us.
Information package for local authorities
Specifically for provinces, municipalities and water authorities, we share information about the project, the route of the hydrogen network, how existing pipelines can be reused, where we currently stand in the project procedure, and answers to frequently asked questions. There is also an image library and links to videos and animations. Use the information package to inform residents through your own channels.
Stay informed with our newsletter
Useful links & downloads
- News specials #6 – Permits and attention to nature and livability (December 19, 2025)
- News specials #5 – The importance of hydrogen and its transport for the region and across the border (December 12, 2025)
- News specials #4 – The studies we conduct and how we align design and technology (December 5, 2025)
- News specials #3 – This is how we involve landowners and land users (November 28, 2025)
- News specials #2 – Choosing a route with attention to the surrounding area (November 21, 2025)
- News specials #1 – The task and procedure: the role of the Ministry of Climate and Green Growth (November 14, 2025)
- Newsletter #8 – Hydrogen Network Southwest Netherlands (June 2026)
- Newsletter #7 – Hydrogen Network Southwest Netherlands (November 2025)
- Newsletter #6 – Hydrogen Network Southwest Netherlands (July 2025)
- Newsletter #5 – Hydrogen Network Southwest Netherlands (January 2025)
- Newsletter #4 – Hydrogen Network Southwest Netherlands (July 2024)
- Newsletter #3 – Hydrogen Network Southwest Netherlands (April 2024)
- Newsletter #2 – Hydrogen Network Southwest Netherlands (November 2023)
- Newsletter #1 – Hydrogen Network Southwest Netherlands (August 2023)
Frequently asked questions
What will I experience as a result of hydrogen network construction?
Developing a hydrogen network project will have an impact on the surrounding area and the environment. In addition, there are already many other cables and pipelines in the crowded underground. We want to limit this impact. We will do so by using existing natural gas transport pipelines as much as possible. When new pipes are needed, we will join them to existing pipelines wherever possible. As with natural gas, the immediate vicinity of the pipeline (the route) will be kept free of buildings for safety reasons.
As well as the spatial impact, there also will be temporary disruptions during the construction and modification of pipelines and installations. Gasunie has extensive experience in building natural gas transport networks. The impact of a hydrogen network by Hynetwork will be similar. For example, there may be noise and vibrations, and space must be made available for work sites. As we get closer to construction, we will communicate promptly with neighbouring residents about the impact. You will not notice the transport of hydrogen through the pipes.
Can I connect my home to the hydrogen network?
No, we will not connect your home to the hydrogen network. Green hydrogen (produced with green electricity) is still in short supply, so it is important to make smart choices about where (green) hydrogen can be used and where it will have the greatest effect. For domestic use, such as heating, showering and cooking, there are already suitable sustainable alternatives, such as electric heating. For other sectors, such as heavy industry, green hydrogen is often the only way to become sustainable. Therefore, our limited supply of green hydrogen should be used mainly in those sectors where, even in the long term, there is no sustainable alternative.
Connecting homes and smaller businesses is the job of regional grid operators, such as Stedin or Enexis. They are exploring the possibility of a hydrogen network for homes and smaller businesses in the future.
Will there also be a low-pressure hydrogen pipeline in the regions?
As with the natural gas network, we make a distinction in the hydrogen network between a high-pressure network (being developed by Hynetwork) and a low-pressure network (being developed by distribution network operators such as Alliander). Hynetwork is only laying a high-pressure network. In the future, regional distribution networks can be linked to the national hydrogen network operated by Hynetwork. Currently, the legal framework of linking distribution networks to the national hydrogen network is not yet in place.
How can I participate in the plans?
Construction of the hydrogen network requires permits from various government bodies. To keep everything on track, the Ministry of Economic Affairs and Climate Policy (EZK) is coordinating the decision-making process. We call this the Project Procedure. EZK and Hynetwork Services believe it is important that everyone has the opportunity to contribute ideas. This is why we will organise walk-in meetings among other things, and there will be several opportunities to submit responses and comments.
Is Hynetwork responsible for the import and production of hydrogen?
Hynetwork is only concerned with the transport network for hydrogen and not about the production, import or use of hydrogen.